Chint Power CPS SC1.5KTL Specifiche Pagina 17

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 51
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 16
15
Connecting to the grid (AC utility)
1. Measure grid (utility) voltage and frequency. It should be 230VAC, 50Hz,
and single phase.
2. Open the breaker or fuse between PV-Inverter and utility.
3. For CPS SC1. 5KTL, SC2.8KTL, SC2KTL, SC4KTL and SC4KT L-O,
connect AC wires as follows:
z Insert utility wires through cable gland. Connect wires according t o
polarities indicated on terminal block. L LINE (brown or black), N
Neutral (blue) and system ground (yellow-green).
z Fasten the gland plate with attached screws.
z Twist the gland so that the cable is firmly fixed.
z Refer to left figure.
Vedere la pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 50 51

Commenti su questo manuale

Nessun commento